Construction, installation, pre-commissioning, testing, commissioning and handover of Units 4, 5 & 6 and associated Balance of Plant (BOP) systems.
Muzaffargarh, Pakistan, Pakistan • Jan 1995 – Mar 1997
| Project Owner | Water & Power Development Authority (WAPDA) |
|---|---|
| Main EPC Contractor | CMEC, China |
| Consultant | Muzaffargarh Thermal Power Consultants (MTPC) |
| Employer / Company | Water & Power Development Authority (WAPDA) |
| Location | Muzaffargarh, Pakistan |
| Country | Pakistan |
| Industry | Power |
|---|---|
| Technologies & Systems | Controls & Instrumentation, DCS, Low Current Systems, PABX, PLC, Power Generation, Power Line Carrier Communication System, Power Plant, Power Plant Simulator, Steam Turbine Generating Units, Telephone Network, Thermal |
| Project Type | Power Plant |
| Capacity / Specifications | 740 MW (2x210+320) |
| Status | Completed |
| Start Month / Year | Jan 1995 |
| End Month / Year | Mar 1997 |
| Project Duration | 2 Years 2 Months |
Position / Role: Project Engineer I&C
Construction, installation, pre-commissioning, testing, commissioning and handover of Units 4, 5 & 6 and associated Balance of Plant (BOP) systems.
Successfully contributed to construction and commissioning of the 740 MW new generating units and associated BOP systems.
| Manufacturer | Equipment |
|---|---|
| Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. | Industrial Boiler, Steam Turbine, Generator and BOP equipment |
| Industrial Boiler, Steam Turbine, Generator and BOP equipment | |
| Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. | Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. |
| Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. | |
| Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. | E3 |
| Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. | |
| Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. | E4 |
| Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. | |
Successful delivery of a large thermal power project requires strong Owner-side engineering leadership, disciplined I&C construction supervision, and close coordination with the EPC Contractor throughout construction, testing, commissioning, and handover. Early identification and resolution of I&C and BOP issues is critical to maintaining commissioning progress and achieving reliable plant operation.