WAPDA Muzaffargarh Thermal Power Plant Project – Units 4,5&6

Muzaffargarh, Pakistan, Pakistan • Jan 1995 – Mar 1997

Project Overview
Project OwnerWater & Power Development Authority (WAPDA)
Main EPC ContractorCMEC, China
ConsultantMuzaffargarh Thermal Power Consultants (MTPC)
Employer / CompanyWater & Power Development Authority (WAPDA)
LocationMuzaffargarh, Pakistan
CountryPakistan
Technical Information
IndustryPower
Technologies & SystemsControls & Instrumentation, DCS, Low Current Systems, PABX, PLC, Power Generation, Power Line Carrier Communication System, Power Plant, Power Plant Simulator, Steam Turbine Generating Units, Telephone Network, Thermal
Project TypePower Plant
Capacity / Specifications740 MW (2x210+320)
StatusCompleted
Start Month / YearJan 1995
End Month / YearMar 1997
Project Duration2 Years 2 Months
The Role

Position / Role: Project Engineer I&C

Scope of Work

Construction, installation, pre-commissioning, testing, commissioning and handover of Units 4, 5 & 6 and associated Balance of Plant (BOP) systems.

Key Responsibilities

Key Achievements

Successfully contributed to construction and commissioning of the 740 MW new generating units and associated BOP systems.

Main Equipment & Manufacturer
ManufacturerEquipment
Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. Industrial Boiler, Steam Turbine, Generator and BOP equipment
Industrial Boiler, Steam Turbine, Generator and BOP equipment
Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc.
Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc.
Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. E3
Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc.
Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc. E4
Control Systems: FSSS: Burner Management System with OMRAN Sysmac C2000-H duplex PLC, DEH-III: Digital Electro-Hydraullic Turine Control System, YEWPACK-II: DCS, DAS-300 Data Acquisition System, Sulzer AV6 Turbine Bypass Control System etc.
Lessons Learned

Successful delivery of a large thermal power project requires strong Owner-side engineering leadership, disciplined I&C construction supervision, and close coordination with the EPC Contractor throughout construction, testing, commissioning, and handover. Early identification and resolution of I&C and BOP issues is critical to maintaining commissioning progress and achieving reliable plant operation.