Construction supervision and commissioning of C&I systems for the 2080 MW SEC PP9 Extension & Reinforcement Project, Block C, D & F, including commissioning inspections, FAT/SAT witnessing, and EPC contractor management.
Riyadh, KSA, Saudi Arabia • Jul 2007 – Mar 2009
| Project Owner | Saudi Electricity Company (SEC-COA) |
|---|---|
| Main EPC Contractor | Arabian BEMCO Contracting Co. |
| Consultant | Saudi Consulting Services (Saud Consult) |
| Employer / Company | Saudi Consulting Services (Saud Consult) |
| Location | Riyadh, KSA |
| Country | Saudi Arabia |
| Industry | Power |
|---|---|
| Technologies & Systems | BOP, Cooling Water System, DCS, Fuel Gas System, Fuel Oil treatment, Fuel tanks, Gas Turbine, Low Current Systems, PLC, Power Generation, Power Plant |
| Project Type | Power Plant |
| Capacity / Specifications | 1920 MW (32 × 60 MW) |
| Status | Completed |
| Start Month / Year | Jul 2007 |
| End Month / Year | Mar 2009 |
| Project Duration | 1 Year 8 Months |
Position / Role: Project Engineer I&C (Consultant)
Construction supervision and commissioning of C&I systems for the 2080 MW SEC PP9 Extension & Reinforcement Project, Block C, D & F, including commissioning inspections, FAT/SAT witnessing, and EPC contractor management.
Supervision of construction and commissioning activities for 32 × 60 MW GE Frame 7EA gas turbine generating units and associated BOP systems, including MARK-VI Turbine Control System, MARK-VIe DCS, SCADA, GT water wash, fire detection and protection, fuel handling and storage, Fuel Oil Treatment Plant, Fuel Gas Plant, clock and paging systems, access control and security systems. Responsibilities included material inspections, site inspections and installation reviews, instrument calibration checks, cold and hot loop checks, offline and online safety/interlock tests, performance tests, contractor coordination, issue resolution, and punch-list preparation.
Successfully supported construction and commissioning of the PP9 extension blocks and associated electrical, control and auxiliary systems.
| Manufacturer | Equipment |
|---|---|
| General Electric, USA | GE Frame 7EA GTGs |
| 32 × 60 MW gas turbine generating units | |
| General Electric, USA | MARK-VI TCS |
| GE MARK-VI Turbine Control System for gas turbine control and protection | |
| General Electric, USA | MARK-VIe DCS |
| Distributed Control System for plant monitoring and control | |
| SCADA | |
| Supervisory Control and Data Acquisition system | |
| GT Water Wash System | |
| Gas turbine water wash system | |
| Fire Detection & Protection | |
| Fire detection and protection systems | |
| Fuel Handling & Storage | |
| Fuel handling and storage systems for the generating units | |
| Fuel Oil Treatment Plant (FOTP) | |
| Fuel oil treatment and conditioning system | |
| Fuel Gas Plant | |
| Fuel gas supply and distribution systems | |
| Clock & Paging System | |
| Plant-wide clock and paging communication systems | |
| Access Control System | |
| Access control and security management system | |
| Security CCTV System | |
| Security surveillance CCTV system | |
Early coordination between construction, I&C engineering, commissioning and the EPC contractor is critical for successful power plant project execution. Systematic inspection, calibration, loop checking and interlock testing before energization significantly reduces commissioning issues and facilitates timely resolution of outstanding items. For large multi-unit projects, maintaining disciplined documentation, interface coordination and punch-list control is essential for achieving safe and efficient commissioning and handover.