Upgrade of the control systems for GE Gas Turbine Units GT8 & GT9 from Mark-V to Mark-VIe, including system integration, testing and commissioning.
Al Qunfudha, Saudi Arabia • Feb 2022 – Feb 2024
| Project Owner | Saudi Electricity Company (SEC-WOA) |
|---|---|
| Main EPC Contractor | Saudi Arabian Engineering Co. (SAECO) |
| Consultant | SEC Tehama EPP Technical Support Department |
| Employer / Company | Energy Resources Development Company (TAACA) |
| Location | Al Qunfudha |
| Country | Saudi Arabia |
| Industry | Power |
|---|---|
| Technologies & Systems | Controls & Instrumentation, Controls & Protection, DCS, Power Generation, Power Plant |
| Project Type | Retrofit |
| Capacity / Specifications | 2 x 60 MW |
| Status | Completed |
| Start Month / Year | Feb 2022 |
| End Month / Year | Feb 2024 |
| Project Duration | 2 Years |
Position / Role: Control Systems Engineer & Projects Leader
Upgrade of the control systems for GE Gas Turbine Units GT8 & GT9 from Mark-V to Mark-VIe, including system integration, testing and commissioning.
Led the project lifecycle from initiation through final commissioning and hand over; managed the EPC Contractor as Owner’s Project Leader; supervised control-system engineering, installation, integration, testing and commissioning; coordinated interfaces with existing plant systems and operations.
Successfully completed the GT8 & GT9 control-system upgrade and migration from GE Mark-V to Mark-VIe.
Control-system migration in an operating power plant requires careful planning, detailed understanding of the existing system, disciplined configuration management and comprehensive testing. Successful migration depends on close coordination among the Owner, EPC Contractor and operations team, with thorough integration testing and commissioning to ensure continuity of safe and reliable unit operation.