Upgrade of the Fuel Unloading Control System at SEC Tehama EPP:
(Allen Bradley Compact Logix 5380 PLC, Factory Talk View SE Station, Studio 5000 and other hardware/ software etc)
Al qunfudha, Saudi Arabia • Apr 2022 – Jun 2024
| Project Owner | Saudi Electricity Company (SEC-WOA) |
|---|---|
| Main EPC Contractor | Saudi Arabian Engineering Co. (SAECO) |
| Consultant | SEC Tehama EPP Technical Support Department |
| Employer / Company | Energy Resources Development Company (TAACA) |
| Location | Al qunfudha |
| Country | Saudi Arabia |
| Industry | Power |
|---|---|
| Technologies & Systems | Controls & Instrumentation, Fuel Handling System, Fuel Unloading Control system, Industrial automation, PLC, SCADA |
| Project Type | Retrofit |
| Status | Completed |
| Start Month / Year | Apr 2022 |
| End Month / Year | Jun 2024 |
| Project Duration | 2 Years 2 Months |
Position / Role: Control Systems Engineer & Projects Leader
Upgrade of the Fuel Unloading Control System at SEC Tehama EPP:
(Allen Bradley Compact Logix 5380 PLC, Factory Talk View SE Station, Studio 5000 and other hardware/ software etc)
Managed the EPC Contractor as Owner’s Engineer; supervised engineering, implementation, integration, testing and commissioning; coordinated interfaces with existing fuel-handling systems and plant operations.
Successful completion of the assigned Fuel Unloading Control System upgrade scope.
Upgrading a control system within an operating fuel-handling facility requires careful management of existing-system interfaces, control logic, operational requirements and commissioning activities. Thorough testing, effective contractor coordination and close involvement of plant operations are essential for safe and reliable system integration.