SEC Tehama EPP – Upgrade of Control Systems for GT#10&11 Fuel Forwarding Pumps

Al Qunfudha, Saudi Arabia • Apr 2023 – Apr 2025

Project Overview
Project OwnerSaudi Electricity Company (SEC-WOA)
Main EPC ContractorSaudi Electronic Trading & Contracting Co. (SETRA)
ConsultantSEC Tehama EPP Technical Support Department
Employer / CompanyEnergy Resources Development Company (TAACA)
LocationAl Qunfudha
CountrySaudi Arabia
Technical Information
IndustryPower
Technologies & SystemsControls & Instrumentation, Industrial automation, PLC
Project TypeRetrofit
StatusCompleted
Start Month / YearApr 2023
End Month / YearApr 2025
Project Duration2 Years
The Role

Position / Role: Control Systems Engineer & Projects Leader

Scope of Work

Upgrade of the control systems for GT#10 & GT#11 fuel-forwarding pumps at SEC Tehama EPP:
(System Cabinets with SIEMENS SIMATIC S7-1500 PLCs, Local Control Panels, DCS Integration etc.)

Key Responsibilities

Managed the EPC Contractor as Owner’s Project Leader; supervised engineering, control-system implementation, integration, testing and commissioning; coordinated interfaces with existing plant fuel systems and operations.

Key Achievements

Successful completion of the assigned control-system upgrade scope.

Lessons Learned

Control-system upgrades for critical fuel-forwarding equipment require careful coordination between process requirements, control logic, equipment interfaces and plant operations. Thorough functional testing, interface verification and commissioning are essential to ensure dependable operation before returning equipment to service.