Upgrade of the control systems for GT#10 & GT#11 fuel-forwarding pumps at SEC Tehama EPP:
(System Cabinets with SIEMENS SIMATIC S7-1500 PLCs, Local Control Panels, DCS Integration etc.)
Al Qunfudha, Saudi Arabia • Apr 2023 – Apr 2025
| Project Owner | Saudi Electricity Company (SEC-WOA) |
|---|---|
| Main EPC Contractor | Saudi Electronic Trading & Contracting Co. (SETRA) |
| Consultant | SEC Tehama EPP Technical Support Department |
| Employer / Company | Energy Resources Development Company (TAACA) |
| Location | Al Qunfudha |
| Country | Saudi Arabia |
| Industry | Power |
|---|---|
| Technologies & Systems | Controls & Instrumentation, Industrial automation, PLC |
| Project Type | Retrofit |
| Status | Completed |
| Start Month / Year | Apr 2023 |
| End Month / Year | Apr 2025 |
| Project Duration | 2 Years |
Position / Role: Control Systems Engineer & Projects Leader
Upgrade of the control systems for GT#10 & GT#11 fuel-forwarding pumps at SEC Tehama EPP:
(System Cabinets with SIEMENS SIMATIC S7-1500 PLCs, Local Control Panels, DCS Integration etc.)
Managed the EPC Contractor as Owner’s Project Leader; supervised engineering, control-system implementation, integration, testing and commissioning; coordinated interfaces with existing plant fuel systems and operations.
Successful completion of the assigned control-system upgrade scope.
Control-system upgrades for critical fuel-forwarding equipment require careful coordination between process requirements, control logic, equipment interfaces and plant operations. Thorough functional testing, interface verification and commissioning are essential to ensure dependable operation before returning equipment to service.