SEC Tehama EPP – Replacement of Mist Eliminators for Units 8~13

Tehama EPP, Al qunfudha, Saudi Arabia • Mar 2024 – Mar 2026

Project Overview
Project OwnerSaudi Electricity Company - WOA
Main EPC ContractorDar-Al-Balad Contracting Co.
ConsultantSEC Technical Support Department
Employer / CompanyEnergy Resources Development Co.
LocationTehama EPP, Al qunfudha
CountrySaudi Arabia
Technical Information
IndustryPower
Technologies & SystemsOil Mist Separator, Vapor Extraction Blower
Project TypeRetrofit
Capacity / Specifications6 x 60 MW
StatusCompleted
Start Month / YearMar 2024
End Month / YearMar 2026
Project Duration2 Years
The Role

Position / Role: Projects Leader

Scope of Work

Replacement of Vapor Extraction System (Oil Mist Eliminators) at SEC Tehama EPP GT#8~13

Key Responsibilities

Key Achievements

Successfully completed the replacement of the Vapor Extraction System (Oil Mist Separators) for GT Units #8–13, improving equipment reliability and supporting safe, stable operation of the gas turbine units

Main Equipment & Manufacturer
ManufacturerEquipment
Cleanova / Dollinger Oil Mist Eliminator (OME), Model OE-158B
Blower-Assisted Vapor Extraction System
Lessons Learned

Successful replacement of critical lube-oil Vapor Extraction Systems requires thorough assessment of existing equipment, careful coordination with the gas-turbine maintenance schedule, and close Owner–Contractor supervision to ensure safe installation, testing, and commissioning without compromising unit availability.