EI&C construction, pre-commissioning, commissioning, testing, start-up, performance verification and final handover of four 723 MW supercritical thermal generating units and associated Balance of Plant (BOP) systems.
Jeddah, KSA, Saudi Arabia • Dec 2013 – Jan 2017
| Project Owner | Saudi Electricity Company (SEC-WOA) |
|---|---|
| Main EPC Contractor | Hyundai Heavy Industries Co. (HHI), KSA |
| Consultant | Hyundai Heavy Industries Co. (HHI), KSA |
| Employer / Company | Saudi Consulting Services (Saud Consult) |
| Location | Jeddah, KSA |
| Country | Saudi Arabia |
| Industry | Power |
|---|---|
| Technologies & Systems | BOP, Condensate Polishing, Controls & Instrumentation, Controls & Protection, Cooling Water System, DCS, Electrical Power & Lighting, Electro Chlorination, MV/ LV Motors, MV/LV Switchgear, PLC, Power Generation, Power Plant, Power Transformers, Protection Relays, Sea Water Intake system, Steam Turbine Generating Units, Thermal |
| Project Type | Power Plant |
| Capacity / Specifications | 2,892 MW (4 × 723 MW) |
| Status | Completed |
| Start Month / Year | Dec 2013 |
| End Month / Year | Jan 2017 |
| Project Duration | 3 Years 1 Month |
Position / Role: Principal EI&C Engineer (Consultant)
EI&C construction, pre-commissioning, commissioning, testing, start-up, performance verification and final handover of four 723 MW supercritical thermal generating units and associated Balance of Plant (BOP) systems.
Led EI&C commissioning and start-up activities; reviewed commissioning procedures and engineering documentation; coordinated testing, energization and start-up; managed multidisciplinary commissioning interfaces; supervised field installations, electrical acceptance tests and instrument calibration; monitored quality, safety and technical compliance; supported Performance Guarantee Tests and final project handover.
Successfully supported the construction, commissioning, and commercial acceptance of four 723 MW supercritical thermal units (2,892 MW total), including field instrument calibrations, interlock verification, GSU transformer energization, grid synchronization and load rejection tests. Supported safe, reliable and timely project completion. Received a formal Letter of Appreciation from Saudi Electricity Company (SEC).
Successful commissioning of a mega-scale thermal power plant requires disciplined EI&C leadership, systematic readiness verification and strong coordination across the Client, Consultant, EPC Contractor and specialist equipment suppliers. Effective management of testing, energization, instrumentation calibration, multidisciplinary interfaces and performance testing is essential to achieve safe start-up, reliable operation and successful commercial handover.