SEC Jeddah South Power Plant

Jeddah, KSA, Saudi Arabia • Dec 2013 – Jan 2017

Project Overview
Project OwnerSaudi Electricity Company (SEC-WOA)
Main EPC ContractorHyundai Heavy Industries Co. (HHI), KSA
ConsultantHyundai Heavy Industries Co. (HHI), KSA
Employer / CompanySaudi Consulting Services (Saud Consult)
LocationJeddah, KSA
CountrySaudi Arabia
Technical Information
IndustryPower
Technologies & SystemsBOP, Condensate Polishing, Controls & Instrumentation, Controls & Protection, Cooling Water System, DCS, Electrical Power & Lighting, Electro Chlorination, MV/ LV Motors, MV/LV Switchgear, PLC, Power Generation, Power Plant, Power Transformers, Protection Relays, Sea Water Intake system, Steam Turbine Generating Units, Thermal
Project TypePower Plant
Capacity / Specifications2,892 MW (4 × 723 MW)
StatusCompleted
Start Month / YearDec 2013
End Month / YearJan 2017
Project Duration3 Years 1 Month
The Role

Position / Role: Principal EI&C Engineer (Consultant)

Scope of Work

EI&C construction, pre-commissioning, commissioning, testing, start-up, performance verification and final handover of four 723 MW supercritical thermal generating units and associated Balance of Plant (BOP) systems.

Key Responsibilities

Led EI&C commissioning and start-up activities; reviewed commissioning procedures and engineering documentation; coordinated testing, energization and start-up; managed multidisciplinary commissioning interfaces; supervised field installations, electrical acceptance tests and instrument calibration; monitored quality, safety and technical compliance; supported Performance Guarantee Tests and final project handover.

Key Achievements

Successfully supported the construction, commissioning, and commercial acceptance of four 723 MW supercritical thermal units (2,892 MW total), including field instrument calibrations, interlock verification, GSU transformer energization, grid synchronization and load rejection tests. Supported safe, reliable and timely project completion. Received a formal Letter of Appreciation from Saudi Electricity Company (SEC).

Lessons Learned

Successful commissioning of a mega-scale thermal power plant requires disciplined EI&C leadership, systematic readiness verification and strong coordination across the Client, Consultant, EPC Contractor and specialist equipment suppliers. Effective management of testing, energization, instrumentation calibration, multidisciplinary interfaces and performance testing is essential to achieve safe start-up, reliable operation and successful commercial handover.