Portfolio

SEC PP9 Extension & Reinforcement Project, Block C,D&F

Riyadh, KSA, Saudi Arabia • Jul 2007 – Mar 2009

Project Overview
Project OwnerSaudi Electricity Company (SEC-COA)
Main EPC ContractorArabian BEMCO Contracting Co.
ConsultantSaudi Consulting Services (Saud Consult)
Employer / CompanySaudi Consulting Services (Saud Consult)
LocationRiyadh, KSA
CountrySaudi Arabia
Technical Information
IndustryPower
Technologies & SystemsBOP, Cooling Water System, DCS, Fuel Gas System, Fuel Oil treatment, Fuel tanks, Gas Turbine, Low Current Systems, PLC, Power Generation, Power Plant
Project TypePower Plant
Capacity / Specifications1920 MW (32 × 60 MW)
StatusCompleted
Start Month / YearJul 2007
End Month / YearMar 2009
Project Duration1 Year 8 Months
The Role

Position / Role: Project Engineer I&C (Consultant)

Scope of Work

Construction supervision and commissioning of C&I systems for the 2080 MW SEC PP9 Extension & Reinforcement Project, Block C, D & F, including commissioning inspections, FAT/SAT witnessing, and EPC contractor management.

Key Responsibilities

Supervision of construction and commissioning activities for 32 × 60 MW GE Frame 7EA gas turbine generating units and associated BOP systems, including MARK-VI Turbine Control System, MARK-VIe DCS, SCADA, GT water wash, fire detection and protection, fuel handling and storage, Fuel Oil Treatment Plant, Fuel Gas Plant, clock and paging systems, access control and security systems. Responsibilities included material inspections, site inspections and installation reviews, instrument calibration checks, cold and hot loop checks, offline and online safety/interlock tests, performance tests, contractor coordination, issue resolution, and punch-list preparation.

Key Achievements

Successfully supported construction and commissioning of the PP9 extension blocks and associated electrical, control and auxiliary systems.

Main Equipment & Manufacturer
ManufacturerEquipment
General Electric, USA GE Frame 7EA GTGs
32 × 60 MW gas turbine generating units
General Electric, USA MARK-VI TCS
GE MARK-VI Turbine Control System for gas turbine control and protection
General Electric, USA MARK-VIe DCS
Distributed Control System for plant monitoring and control
SCADA
Supervisory Control and Data Acquisition system
GT Water Wash System
Gas turbine water wash system
Fire Detection & Protection
Fire detection and protection systems
Fuel Handling & Storage
Fuel handling and storage systems for the generating units
Fuel Oil Treatment Plant (FOTP)
Fuel oil treatment and conditioning system
Fuel Gas Plant
Fuel gas supply and distribution systems
Clock & Paging System
Plant-wide clock and paging communication systems
Access Control System
Access control and security management system
Security CCTV System
Security surveillance CCTV system
Lessons Learned

Early coordination between construction, I&C engineering, commissioning and the EPC contractor is critical for successful power plant project execution. Systematic inspection, calibration, loop checking and interlock testing before energization significantly reduces commissioning issues and facilitates timely resolution of outstanding items. For large multi-unit projects, maintaining disciplined documentation, interface coordination and punch-list control is essential for achieving safe and efficient commissioning and handover.