SEC Rabigh PP Stage 5&7 and Al-Wajh PP Units 1~3

Rabigh & Al-Wajh, KSA, Saudi Arabia • Mar 2009 – Apr 2013

Project Overview
Project OwnerSaudi Electricity Company (SEC-WOA)
Main EPC ContractorNational Contracting Co. (NCC)
ConsultantSaudi Consulting Services/ National Engineering Services (SaudConsult-NESPAK)
Employer / CompanySaudi Consulting Services (Saud Consult)
LocationRabigh & Al-Wajh, KSA
CountrySaudi Arabia
Technical Information
IndustryPower
Technologies & SystemsControls & Instrumentation, DCS, Fuel Oil treatment, Fuel tanks, Gas Turbine, Low Current Systems, PLC, Power Generation, Power Plant
Project TypePower Plant
Capacity / Specifications16 × 60 MW (Rabigh Stage 5) + 12 × 60 MW (Rabigh Stage 7) + 3 × 60 MW (Al-Wajh) = 1,860 MW
StatusCompleted
Start Month / YearMar 2009
End Month / YearApr 2013
Project Duration4 Years 1 Month
The Role

Position / Role: Lead I&C Engineer (Consultant)

Scope of Work

Construction, testing, commissioning and handover support for the Rabigh Stage V & VII and Al-Wajh Units 1–3 gas turbine power plant extensions (31 units)

Key Responsibilities

Key Achievements

Successfully led the I&C engineering team through construction, commissioning, and handover support for commercial operation of 31 gas turbine units across the Rabigh and Al-Wajh Power Plant Extension Projects.

Main Equipment & Manufacturer
ManufacturerEquipment
General Electric USA Gas Turbine Generator
GE Frame 7EA 60 MW gas turbine generating units
General Electric USA Gas Turbine Control System
GE Mark VI control and protection
General Electric USA Plant DCS
GE Mark VIe Distributed Control System
Lessons Learned

Effective coordination between I&C engineering, construction, commissioning, and multiple project stakeholders is critical to achieving successful startup and commercial operation of large-scale gas turbine power plants.