Construction, testing, commissioning and handover support for the Rabigh Stage V & VII and Al-Wajh Units 1–3 gas turbine power plant extensions (31 units)
Rabigh & Al-Wajh, KSA, Saudi Arabia • Mar 2009 – Apr 2013
| Project Owner | Saudi Electricity Company (SEC-WOA) |
|---|---|
| Main EPC Contractor | National Contracting Co. (NCC) |
| Consultant | Saudi Consulting Services/ National Engineering Services (SaudConsult-NESPAK) |
| Employer / Company | Saudi Consulting Services (Saud Consult) |
| Location | Rabigh & Al-Wajh, KSA |
| Country | Saudi Arabia |
| Industry | Power |
|---|---|
| Technologies & Systems | Controls & Instrumentation, DCS, Fuel Oil treatment, Fuel tanks, Gas Turbine, Low Current Systems, PLC, Power Generation, Power Plant |
| Project Type | Power Plant |
| Capacity / Specifications | 16 × 60 MW (Rabigh Stage 5) + 12 × 60 MW (Rabigh Stage 7) + 3 × 60 MW (Al-Wajh) = 1,860 MW |
| Status | Completed |
| Start Month / Year | Mar 2009 |
| End Month / Year | Apr 2013 |
| Project Duration | 4 Years 1 Month |
Position / Role: Lead I&C Engineer (Consultant)
Construction, testing, commissioning and handover support for the Rabigh Stage V & VII and Al-Wajh Units 1–3 gas turbine power plant extensions (31 units)
Successfully led the I&C engineering team through construction, commissioning, and handover support for commercial operation of 31 gas turbine units across the Rabigh and Al-Wajh Power Plant Extension Projects.
| Manufacturer | Equipment |
|---|---|
| General Electric USA | Gas Turbine Generator |
| GE Frame 7EA 60 MW gas turbine generating units | |
| General Electric USA | Gas Turbine Control System |
| GE Mark VI control and protection | |
| General Electric USA | Plant DCS |
| GE Mark VIe Distributed Control System | |
Effective coordination between I&C engineering, construction, commissioning, and multiple project stakeholders is critical to achieving successful startup and commercial operation of large-scale gas turbine power plants.