SEC Tehama EPP – Replace all Network Switches for units and DCS
Led the replacement of network switches across the generating units and DCS infrastructure at SEC Tehama EPP, managing the EPC Contractor as Control Systems Engineer & Projects Leader and coordinating network configuration, DCS connectivity, system interfaces, testing and commissioning to ensure reliable control-system communication and plant operation.